Searched refs:optimize_sc (Results 1 – 4 of 4) sorted by relevance
937 optimize_sc (partial_schedule_ptr ps, ddg_ptr g) in optimize_sc() function1636 opt_sc_p = optimize_sc (ps, g); in sms_schedule()
9241 (optimize_sc): Update for above field and SCHED_* macro changes.11713 (optimize_sc): Adjust call to remove_node_from_ps.15888 (update_node_sched_params, set_must_precede_follow, optimize_sc):15891 (sms_schedule): Call optimize_sc.
17263 (optimize_sc): Likewise.34031 * modulo-sched.c (optimize_sc): Allow branch-scheduling to add a new
937 optimize_sc (partial_schedule_ptr ps, ddg_ptr g) in optimize_sc() function1635 opt_sc_p = optimize_sc (ps, g); in sms_schedule()